Home › Services
All services

Reinstatement services in Singapore

One contractor for every tenancy type. Office, retail, F&B, industrial, residential and M&E electrical reinstatement, all delivered with building management compliance, LEW endorsement where required, and a documented turnover inspection.

Fixed-price quotes within 24 hours. First-pass handover guaranteed.

Commercial reinstatement

For tenants ending office, retail, F&B or industrial leases. Every commercial scope includes partition removal, ceiling and flooring make-good, LEW-endorsed electrical decommissioning, and a signed handover report.

Specialist, residential & add-on services

Electrical decommissioning as a standalone scope, full residential reinstatement, and air-con servicing add-ons for end-of-tenancy handover.

What is included in every reinstatement scope

Every MCSG reinstatement project follows the same proven handover framework, regardless of property type. We manage the full lifecycle from initial site survey to final turnover inspection, so you do not have to coordinate multiple subcontractors.

  • Site survey and scope documentation: We photograph the existing condition, measure the floor area, and itemise every reinstatement work item against your tenancy agreement's make-good clause.
  • Partition and ceiling removal: Drywall partition hacking, suspended ceiling dismantling, and disposal of all demolition debris through licensed waste hauliers.
  • Electrical decommissioning with LEW endorsement: Where electrical works are required, a Licensed Electrical Worker (LEW) certifies the disconnection and submits the necessary notification to SP Group.
  • Building management permit coordination: We handle work permit applications, move-in/move-out bookings, and lift reservations with the building management office or managing agent.
  • Final turnover inspection: A documented handover inspection with the landlord or managing agent, including a signed reinstatement completion report and photo evidence of the bare-shell condition.
  • Public Liability Insurance coverage: All works are covered by our Public Liability Insurance policy, protecting you and the building owner against third-party claims during the reinstatement period.

How to choose the right reinstatement contractor

Not all reinstatement contractors are the same. The cheapest quote often comes with hidden costs, missed deadlines, or failed handover inspections that delay your deposit return. When evaluating contractors for your end-of-tenancy handover, look for these signals:

  • Fixed-price quotes, not estimates: A professional reinstatement contractor provides a fixed price after a site survey, not a vague estimate that changes halfway through the project. Every scope item should be listed with a clear cost.
  • LEW endorsement for electrical works: If your scope includes electrical disconnection, the contractor must engage a Licensed Electrical Worker (LEW) to certify the works. Without LEW endorsement, the building management may reject the handover.
  • Building management experience: Every building has different rules, permit requirements and protected working hours. A contractor familiar with your building's management office can avoid costly delays and permit rejections.
  • Turnover inspection documentation: The contractor should provide a signed handover report with before-and-after photos, a scope completion checklist, and any required compliance certificates such as LEW endorsement or waste disposal records.
  • Public Liability Insurance: Always confirm the contractor carries Public Liability Insurance. This protects you if something goes wrong during the works, such as damage to common areas or injury to third-party personnel.

Reinstatement services FAQ

How long does a typical reinstatement take in Singapore?

A standard office or retail reinstatement takes 5 to 10 working days depending on the floor area and scope complexity. Industrial units with heavy machinery removal may require 2 to 3 weeks. We provide a detailed project timeline after the initial site survey, and we work after hours or on weekends if the building management restricts daytime works.

Do you handle building management permit applications?

Yes. We coordinate all work permit submissions, security deposit payments, and lift bookings with the building management office or managing agent. For condominiums and private apartments, we liaise directly with the managing agent to ensure all by-laws are followed, including protected working hours and common area protection requirements.

What happens if the landlord rejects the handover inspection?

If the landlord or managing agent identifies outstanding items during the turnover inspection, we rectify them at no additional cost within the agreed timeline. Our first-pass handover rate is over 95 percent, and we carry a contingency buffer in every quote to cover minor touch-ups. The goal is always to get your deposit released on the first inspection.

Can you work with a landlord-nominated contractor?

Yes. Some tenancy agreements require the tenant to engage a landlord-nominated contractor for specific works such as fire protection system modifications or central air-con disconnection. We coordinate directly with nominated contractors, manage their scope alongside ours, and ensure all interfaces are completed to the building management's satisfaction.

Not sure which service you need?

Send the property type, address, lease-end date and make-good clause on WhatsApp. We will recommend the right scope and send a fixed-price quote within 24 hours.

WhatsApp the project brief