Real Reinstatement Projects

Condo, HDB, office and retail handovers delivered across Singapore. Every project below was completed by MCSG with a passed handover inspection. Client details are anonymised for privacy.

Condo & HDB Handover

Holland Village Area
Two-Bedroom Condo Handover
Condo tenant · Approx. 900 sqft · Multi-trade
S$1,602
  • Ventilation ducting replacement
  • Ceiling repair from water damage
  • Door and door frame replacement
  • Electrical power point restoration
  • Plumbing and basin connection
All five trades completed in a single site visit. Landlord signed off the handover inspection with no remedial requests. Tenant recovered the security deposit per the handover agreement.
Orchard Area
Condo Landlord Make-Good
Landlord · Approx. 700 sqft · 11-item scope
S$700
  • Sliding door track realignment
  • Wardrobe runner replacement
  • Electrical point and switch repair
  • Door handle and lock servicing
  • Letter box and minor fittings
All 11 items assessed on site. Eight charged, three waived as fair wear and tear. One itemised invoice with PayNow details. Unit cleared for re-letting within the week.
Kovan Area
Full HDB Home Reinstatement
Homeowner · 4-room HDB · Full scope
From S$8,000
  • Kitchen cabinet dismantling and disposal
  • Bedroom wardrobe and storage removal
  • False ceiling and partition hacking
  • Electrical rewiring and point capping
  • Plumbing termination and pipe sealing
Full home stripped to bare shell across five zones. Miele appliances serviced with OEM-compatible parts. All warranty bulbs replaced. Unit cleared the building management handover check.
River Valley Area
Luxury Condo Appliance Service
Condo tenant · Approx. 1,200 sqft · M&E only
S$705
  • Miele oven and hob servicing
  • Miele appliance servicing and safety check
  • Electrical safety check and testing
  • Appliance functionality verification
Miele appliances serviced and safety-checked. Electrical safety certificate provided. Handover inspection completed with no outstanding items with no outstanding items.
Orchard Area
Condo Landlord Electrical & Appliance
Landlord · Approx. 800 sqft · M&E scope
S$620
  • Miele microwave repair and testing
  • Water storage heater 20A isolator supply
  • Isolator installation and testing
  • Electrical safety verification
Microwave restored to full working order. 20A isolator installed and tested on the water heater. Invoice billed directly to the landlord as requested. Unit ready for new tenant move-in.
Jurong Lake Area
Condo Painting-Only Handover
Condo tenant · Approx. 1,000 sqft · Finishing only
S$650
  • Wall crack patching and plastering
  • Full interior wall repainting
  • Toilet ceiling repainting
  • Touch-up and cleaning
All walls and toilet ceiling repainted in a single day. Cracks patched before painting. Landlord confirmed the unit met the make-good standard in the tenancy agreement. COD payment as requested.
River Valley Area
Condo Carpentry & Hardware Reinstatement
Condo tenant · Approx. 850 sqft · Carpentry + M&E
S$948
  • Hafele main door stopper replacement
  • Cooker hood supply and installation
  • Existing carpentry modification for hood fit
  • Lock purchase and labour coordination
Hafele door stopper replaced with matching hardware. Cooker hood installed with carpentry modification to fit. Lock purchase labour waived. Building management signed off the handover.

About Our Projects

How long does a typical reinstatement project take?

Most condo and HDB reinstatements take 3 to 7 working days on site. Office and retail projects range from 1 to 4 weeks depending on size and complexity. You should also allow 1 to 2 weeks for building management permit approval before work starts. Plan at least 4 weeks ahead of your lease expiry.

Do you handle building management permits and approvals?

Yes. We coordinate with building management or MCST on your behalf, submit work permit applications, and provide the required Public Liability Insurance documentation. We also work with nominated contractors where the building requires specific vendors for fire safety or ACMV works.

What happens if the landlord finds issues after handover?

If the landlord issues a defects list after the joint inspection, we return to rectify agreed items within the timeframe. Our quotes include a standard defects liability period. Items outside the original scope are quoted separately before work begins.