What the office scope can include
The final written scope is matched to the make-good clause, fit-out drawings, building rules and the condition recorded at handover.
Partitions and joinery
Removal of glass or drywall partitions, meeting rooms, built-ins, feature walls, pantries and tenant-installed counters.
Floor and ceiling
Carpet, vinyl or raised-floor removal; ceiling and slab restoration where the lease requires the base-building condition.
Electrical and data
Removal or reset of tenant lighting, power points, data cabling and associated fit-out components by the appropriate trades.
Air-conditioning and fire systems
Coordination of tenant-installed air-conditioning and fire-protection changes against landlord-approved drawings.
Signage and finishes
Signage removal, patching, repainting and surface making-good to the documented return condition.
Debris and handover
Building-access coordination, protected removal routes, disposal and a snag-ready final clean before inspection.
A handover process built around the lease
Review
Read the make-good clause, landlord instructions, original drawings and handover records.
Survey
Walk the site, identify tenant additions and confirm building access, work-hour and protection rules.
Execute
Sequence removals and specialist trades against the lease-end deadline, with one accountable scope.
Handover
Complete snagging, document the return condition and attend the landlord or managing-agent inspection.
What to send for a useful quote
- Office address and floor area
- Lease-end and key-return dates
- The make-good or reinstatement clause
- Original handover or fit-out drawings
- Photos or a current walkthrough video
- Building work-hour and access rules
- Known M&E or fire-system alterations
- Landlord inspection requirements
A site page cannot determine your contractual scope. The lease and recorded handover condition remain the source of truth.