Home › Blog › Licensed Electrical Worker Rules
Compliance Guide

Who Can Legally Do the Electrical Work in a Reinstatement?

By Mr Kobayashi, Co-Founder, REINSTATE.by MCSG · Updated 2 October 2026 · 7 min read
Only a licensed electrical worker, or a person working under one's supervision, may carry out electrical work in Singapore. Section 82(1) of the Electricity Act 2001 puts that in plain terms, and section 82(5) makes it a separate offence for an owner or occupier to knowingly engage anyone else. The penalty reaches S$10,000 or 12 months' jail.

Almost every reinstatement job has electrical work buried in it. Stripping a cove-lit false ceiling means capping light points. Removing a feature wall means relocating a socket. None of that is a handyman task under Singapore law, and the person who gets charged is not only the contractor.

Who is legally allowed to carry out electrical work in Singapore?

A licensed electrical worker (LEW), or someone acting under an LEW's supervision. Section 82(1) of the Electricity Act 2001 states that an individual must not carry out, or offer or undertake to carry out, any electrical work unless they hold an electrical worker licence or work under the supervision of a licence holder.

The Energy Market Authority licenses three classes of LEW, and the class caps the load they may take charge of:

Class of LEWApproved load
Licensed ElectricianUp to 45kVA
Licensed Electrical TechnicianUp to 150kVA (design)
Licensed Electrical EngineerNo limit

Source: EMA, Handbook for Application of Electrical Installation Licence, Table 1. The Electrician and Technician classes are limited to 1,000V and below; a Technician may operate installations up to 500kVA. A residential reinstatement sits comfortably inside the Licensed Electrician class.

Section 82(3) extends the duty to firms: a business offering electrical work must ensure licence holders actually do it or supervise it. "We have a licensed electrician on our books" fails that test if he never attends the unit.

Can a landlord or tenant be fined for hiring an unlicensed electrician?

Yes, and this is the part most people miss. Section 82(5) says an owner or occupier who wants electrical work done at their premises must not knowingly engage a person who is not permitted to do it. Section 82(7) makes that an offence, carrying the section 92 general penalty of up to S$10,000, 12 months' jail, or both.

Continuing offences attract a further fine of up to S$250 for each day the breach runs after conviction. Separately, section 83(3) covers the consequence everyone actually fears: a rash or negligent act in respect of an installation under your control that causes injury to a person or damage to property carries a fine of up to S$10,000 or imprisonment of up to 3 years.

For a landlord, that reframes the cheap quote. If a tenant proposes to reverse their own alterations using an unlicensed worker, and you know it, the exposure is not only a failed handover inspection.

What electrical work can you legally do yourself?

Two things, essentially. Section 82(8) of the Electricity Act 2001 carves out replacing a lamp connected in your own electrical installation, and replacing a fuse in your own installation similar to that of a household. Everything beyond those two acts, including swapping a switch plate or capping a disused light point, falls back under the licensing rule.

That boundary matters at handover, because the jobs tenants attempt themselves sit on the wrong side of it. Swapping a pendant back to the landlord's original fitting touches the ceiling rose wiring; removing a smart switch means re-terminating live conductors. Our guide to light fittings at handover covers who pays for those items. This is the separate question of who may touch them.

Which reinstatement tasks count as electrical work?

Any task that disturbs wiring, a socket, a switch, a light point or the distribution board. In a typical condo reinstatement that means four to nine separate points: downlight removal after a false ceiling strip-out, feature-wall sockets, an added aircon or water-heater spur, and any sockets installed for a washer-dryer or bidet.
  1. Capping light points. Removing cove lighting or downlights leaves live conductors, which must be terminated in an accessible enclosure, never buried in plaster.
  2. Returning the original fittings. If the handover inventory lists specific fittings, the originals go back on.
  3. Removing added power points. Surface trunking comes off and the wall is patched; concealed points are isolated at the board and the chase is filled.
  4. Aircon and water-heater spurs. Dedicated circuits with isolators, so removal touches the board. See also aircon obligations at end of tenancy.
  5. Restoring the distribution board. Any MCB or RCCB added for the tenant's circuits is removed and the board relabelled.

How much does the electrical part of a reinstatement cost in 2026?

Budget S$80 to S$420 per point, depending on whether it is a like-for-like swap or a concealed point that has to be chased out and patched. Most residential handovers land between S$300 and S$1,200 for the whole electrical scope, which is a small line next to paint and carpentry.
ItemTypical 2026 range
Replace a ceiling light, like for likeS$80 to S$150
New or removed downlight pointS$120 to S$220
Replace a 13A socket, like for likeS$80 to S$120
Added socket on surface trunkingS$180 to S$280
Added socket, concealed and chasedS$260 to S$420
Aircon or water-heater spur with isolatorS$120 to S$380
Distribution board replacement or upgradeS$450 to S$1,200

Ranges triangulated across published 2026 Singapore contractor price lists. Treat full-rewire figures with more caution: two public 2026 price lists put a 4-room HDB rewire at S$1,800 to S$3,500 and at S$4,800 to S$7,800 respectively, a spread wide enough that any single "indicative" number is meaningless without a site visit. A reinstatement almost never needs a rewire anyway; it needs a handful of points returned to the handover state.

When you compare reinstatement quotations, ask whether the electrical line is priced per point and whether the LEW's attendance is inside that figure or billed separately.

Does a commercial unit need an electrical installation licence too?

Often yes, and it is a separate licence from the worker's. EMA requires an electrical installation licence for all installations used in hazardous trades and for non-domestic installations with an approved load exceeding 45kVA, which is 63A three-phase at 400 volts. Installations used exclusively for domestic purposes are exempt.

There is a useful wrinkle for office and retail tenants. Where a tenant buys electricity en bloc through the landlord or MCST, EMA treats that tenant's installation as covered by the landlord's or MCST's licence, unless the tenant kept its own licence from before the en bloc purchase. Before a strip-out, confirm which licence your unit sits under and who the appointed LEW is, because that LEW must be satisfied with the end state. Separate again from the MCST permit for the works.

Does HDB require a permit for electrical works?

For some of it, yes. HDB's renovation guidelines state that flats without higher electrical loading need an HDB permit to install new 15 amp power points for air-conditioners or other higher-capacity appliances. Other electrical work does not need a permit but is still subject to HDB's conditions, and the LEW rule applies regardless.

Two points catch people out on HDB reinstatement. Approved renovation must be completed within 3 months for new flats and 1 month for existing flats, so a permitted handover has little slack. And air-conditioners must be installed by a BCA-trained installer, a different credential from the LEW licence. Check too whether the job needs an HDB-registered contractor.

How do you check an electrician is actually licensed?

Search EMA's ELISE portal before the work starts, not after. The public search for licensed workers at elise.ema.gov.sg needs no login and takes about a minute. Ask for the licence number, confirm the name matches, and keep a screenshot with your handover file.
  1. Ask for the LEW's name and licence number in writing, in the quotation itself.
  2. Search it on ELISE under "Search for Licensed Workers" and confirm the record is active.
  3. Check the class covers the load. A Licensed Electrician is capped at 45kVA, which is ample for a flat but not for a large commercial board.
  4. Confirm who attends site. The licence belongs to a person, not to the company name on the invoice.
  5. File the licence record with the handover inspection photos, so a later deposit dispute has the compliance trail attached.

Reinstatement with the electrical scope handled properly?

Send us the unit and your lease-end date. We will quote the electrical points separately and in writing, with a licensed electrical worker attending, so your handover file holds up.

WhatsApp us for a quote →
Statutory references are to the Electricity Act 2001 as in force on 2 October 2026. Licence classes and the 45kVA threshold are from EMA's published handbook. Cost ranges reflect 2026 Singapore market data and are indicative only; confirm against a written quote.
References & further reading

Authoritative Singapore sources for further reading. This guide is general information, not legal advice, so confirm current rules with the relevant authority.